The MDEQ reiterated that they would be willing to evaluate a design that allows the city to rebuild the headrace and possibly reduce the number of toe drains that must be repaired. If this option is approved, the design must be reviewed and approved by an engineer licensed in Michigan.

This page is a "seed"

This page is a placeholder and may have little to no useful information. You can help Arborwiki by clicking the edit button and adding as much as you can. If you think this article has reached the point where it's grown beyond being a first start, please remove {{seed}} from the article.